POWERCHINA Turpan City Tuokexun County CSP + PV Integrated Project(100MW CT CSP)
Second batch of large-scale scenic base projects in Xinjiang 100MW CT CSP and 900MW PV
Project Overview
The project, located in Tuokexun County, Turpan City, Xinjiang Uygur Autonomous Region, is invested by POWERCHINA RENEWABLE ENERGY CO., LTD., with a total installed capacity of 1GW including 900MW PV and 100MW CT CSP. The 100MW CT CSP, with an 8-hour molten salt storage system, will adopt the molten salt tower CSP technology fully developed by Cosin Solar. The Project, enlisted as one of the second batch of market-based on-grid new energy projects in Xinjiang Uygur Autonomous Region in 2022, will give full play to the resource advantages of the region, provide supporting power supply for local economic development, and effectively improve and stabilize the energy mix of the region.
Cosin Solar won the bid for Solar Field and MSR System equipment supply for the project and will provide advanced Solar field and MSR system and related services for the 100MW CSP part out of the project.