CHN Energy Qinghai Qingyu DC 100MW CSP Project
First batch of large-scale scenic base projects in Qinghai
100MW CT CSP and 900MW PV
100MW CT CSP and 900MW PV
Project Overview
The total installed capacity of CHN Energy Qinghai Qingyu DC Phase II Section 1 project is 1000MW, including PV of 900MW and Tower CSP of 100MW. The 100MW CSP project adopts the molten salt tower CSP technology and is in the Gonghe County, Hainan Tibetan Autonomous Prefecture, Qinghai Province.
Cosin Solar won the bid for Solar Field and MSR System equipment supply for the project and will provide advanced Solar field and MSR system and related services for the 100MW CSP part out of the project.
Parameter Introduction
Installed Capacity
100MW
Storage
12 Hours with Molten Salt