SUPCON SOLAR Delingha 10MW Tower CSP Plant
China's 1st Commercially Operated CSP Project
China's 1st and World's 3rd Molten Salt Tower CSP Project
China's 1st CSP Feed-in Tariff
China's 1st and World's 3rd Molten Salt Tower CSP Project
China's 1st CSP Feed-in Tariff
Project Overview
SUPCON SOLAR Delingha 10MW tower CSP plant is located in Delingha, Qinghai Province, which adopts double heat transfer fluid as water and molten salt, and consists of 21500 sets of 2㎡ heliostat and 1,000 sets of 20㎡ one.
In Jul. 2013, the DSG 10MW project was connected to the grid, and became the 1st commercialized tower CSP plant in China. In Aug. 2016, the integrated molten salt system (receiver, storage tank and thermal exchanger) was successfully commissioned, and the plant became the 1st molten salt tower CSP in China. The plant is also China's first CSP plant entitled to feed-in tariff by NDRC in Sept. 2014 at 1.2 yuan/ kWh.
Parameter Introduction
Installed Capacity
10MW
Storage
2Hours with Molten Salt
Land Area
250,000m²
Solar Field Reflective Area
63,000m²
Tower Numbers
2
Heat Transfer Fluid
Water & Molten Salt
Efficiency at Design Point
15.9%
Molten Salt Temperature
568℃
Steam Parameter
8.83MPa,510℃