CGN New Energy Delingha 1GW Hybrid Project (200MW CT CSP)
Second batch of large-scale scenic base projects in Qinghai
200MW CT CSP and 800MW PV
Project Overview

The Project is part of the phase I (including 800MW PV and 200MW CT CSP with 6-hour molten salt storage) of the CGN New Energy Delingha 2GW CSP + PV Hybrid Project. Located in Delingha City, Qinghai Province, the Project has been selected as one of the second batch of Qinghai’s large-scale solar and wind hybrid projects.

Cosin Solar won the bid for Solar Field and MSR System equipment supply for the project and will provide advanced Solar field and MSR system and related services for the 100MW CSP part out of the project.

Parameter Introduction
Installed Capacity
200MW
Storage
6 Hours with Molten Salt
Land Area
2.7km²
Solar Field Reflective Area
646,020
Heliostat Numbers
21,534
Distance from Ground to the Center of Receiver
210m