On September 7, we received the "Notification of Award" from CGN China Nuclear Power Engineering Co., Ltd., confirming that Cosin Solar has won the contract for Solar Field and MSR Systems equipment supply for the CGN New Energy Delingha 200MW CSP (the “Project”) .
The Project is part of the phase I (including 800MW PV and 200MW CT CSP with 6-hour molten salt storage) of the CGN New Energy Delingha 2GW CSP + PV Hybrid Project. Located in Delingha City, Qinghai Province, the Project has been selected as one of the second batch of Qinghai’s large-scale solar and wind hybrid projects.
The winning means that China’s largest single unit CSP project will adopt molten salt tower CSP technology fully developed by Cosin Solar. According to the division of responsibility, Cosin Solar will mainly be responsible for the engineering, equipment supply, system integrations, related commissioning and operation guidance services of the solar field and MSR system.
The winning further enhances the dominant position of Cosin Solar in the CSP industry. Meanwhile, Cosin Solar will continue to make efforts, relying on its rich engineering, construction and O&M experience accumulated in a number of CSP projects, to create model CSP thermal storage projects for all the clients, furthermore, contributing to green energy development and carbon reduction targets!
Prev:
The ‘Molten Salt Ene...Next:
Right on the track! ...